The 115KV substation project, including design, engineering, manufacturing, testing, delivery, installation and trial operation

 

Client: American - Puerto Rico Power Distribution Company

image14.jpg

【Project Overview 】

 

After being severely damaged by the hurricane, the power grid in Puerto Rico urgently needs to be rebuilt and enhanced in terms of its disaster resilience. The 115KV substation project we undertook features an all-round reinforced design: the steel structure adopts a higher wind resistance level, the equipment selection focuses on corrosion prevention and sealing, and important systems are equipped with redundant backups.

 

At the same time, we integrated distributed energy access points and a faster fault isolation system, aiming to build a more resilient grid node. From the design stage, we maintained close communication with the client and the community, and the final delivery was not just a substation, but also a key cornerstone for the local community to regain confidence and move towards a sustainable energy system in the future.

Customer Testimonials

After replacing the energy-saving transformer, the factory's average monthly electricity consumption has dropped by about 15%. The no-load loss and load loss are significantly lower than the national standard. The electricity bill saved by long-term use is close to the equipment purchase cost, and the cost-effectiveness is outstanding.

Jack Richardson

Jack Richardson

Time: 2022.06.24

The quality of the transformers is excellent, and the technical support team is very professional. They helped us customize the solution according to our specific requirements and provided excellent after-sales service.

Sarah Wilson

Sarah Wilson

Time: 2022.07.15

Outstanding product reliability and performance. We have been using their transformers for over 3 years without any issues. The energy efficiency has significantly reduced our operational costs.

Michael Chen

Michael Chen

Time: 2022.08.20